Stadium Luzhniki Big Sports Arena Scheme. How to get to the big sports arena "Luzhniki

The project of reconstruction is big sports Arena "Luzhniki".

BSA "Luzhniki" is football stadium year-round use with the possibility of mass events of cultural and entertainment character. The stadium meets the requirements of FIFA to stadiums for the 2018 World Cup in Russia. The reconstruction project provides for the preservation of the existing structures of the facade wall and the roof of the stadium, with an increase in the console part of the translucent coating over the audience places.

The total capacity of the stadium is up to 81,000 spectators. Arena provides for the possibility of transformation for various cultural and spectacular and sports events. The project includes accommodation gaming field, organization of the audience infrastructure, administrative, office, trading zones in accordance with the requirements for final matches World Championships at the highest level.

Technical solutions adopted in the project ensure compliance with the requirements for Breeam certification. In January 2018, BSA "Luzhniki" received the Ecological Certificate of Breeam Bespoke.

In 2017, the stadium "Luzhniki" was recognized as the best stadium of the world of 2017. According to the experts of the leading global database in Stadiumdb.com stadiums. The project "BSA Luzhniki" became the winner of the All-Russian Competition on Environmental Development and Energy Efficiency Green Awards 2017 in the "Social Objects" category.

Architectural solutions For the reconstruction project, the SPEECH bureau has been developed.

Photo Ilya Ivanov / Speech and© Dmitry Chistoprudov / Speech

Constructive and volume planning solutions:

  • Design solutions for dismantling;
  • Constructive solutions of reinforced concrete structures and coatings.

Information about engineering equipment, engineering networks, a list of engineering and technical measures, the content of technological solutions:

  • Power supply system;
  • Water supply system;
  • Drainage system;
  • Heating systems, ventilation and air conditioning, thermal networks;
  • Communication networks;
  • Automation and dispatching engineering systems;
  • Project organization of construction;
  • Project organization of work on the demolition and dismantling of capital construction facilities;
  • Fire Safety Activities:
    • Automatic fire alarm system;
    • System alert and managing the evacuation of people in the fire;
    • Automatic water fire extinguishing system;
    • System of air ventilation.
  • Events to ensure compliance with the requirements of energy efficiency and requirements for the equipment of buildings and structures to the instruments of accounting of energy resources used.

Stadium "Luzhniki". In this place are the most significant and important sporting events. The capacity of "Luzhniki" allows you to collect not one thousand fans. No exception and football championship, which is expected in Russia in 2018. In the "Luzhniki" will be held semifinals and the finals of the championship.

Short story

In 1954, the Government of the USSR decided to build a large sports stadium in Luzhniki. Design, and then construction began in 1955. In the course of the construction of the stadium, Ekaterina Furtseva was followed - the leader of the Moscow Committee of the CPSU. Then the sports complex in the "Luzhniki" wore the name of Vladimir Lenin. The construction took place by a shock pace, and in 1956 the solemn opening of the complex took place. Since then, the construction has been repeatedly rebuilt. In 1957, "Luzhniki" took young people and students from all countries within International Festival. In 1973, Valentin Valentinov was a speaker on football matches - a student of the famous Yuri Levitan.

In 1980, perhaps the most important place in the country was just a stadium "Luzhniki" when he took the summer Olympic Games. It was from his arena that the famous capacity of "Luzhniki" was raised into the sky, then 103 thousand people were 103 thousand. At that time, wooden benches were still installed.

90s, early XXI century

In June 1990, the last concert of Viktor Tsoi was held here. High capacity "Luzhniki" allowed 72 thousand people here. In 1992, the complex was privatized, the name of Lenin was removed from the name.

In 1996-1997, the stadium survived the reconstruction and construction of the roof. After plastic seats installed at the stadium "Luzhniki", the capacity of the hall was 78,360 seats.

In 1998, UEFA included a stadium in the five European in 1999. The UEFA Cup final was held here on the field, the French and Italians met. In 2008, the stadium "Luzhniki" assigned an elite status.

In 2018, the famous Moscow Stadium is waiting for participants in the World Cup. To this event there is thorough preparation, the reconstruction is close to completion.

general information

"Luzhniki" was always the largest and spacious stadium of the country. After reconstruction, he will again act as the most large-scale and significant in Russia. All places at the stadium are closed by a visor, which for the first time elevated during the reconstruction in 1997. The width of it originally was 63.5 meters, the weight is 15 thousand tons, keeps on 72 steel supports, the height of each 26 meters. coated fifth generation around treadmills. Reconstruction for the 2018 Championship will increase the capacity of "Luzhniki" to 81 thousand people. Scheduled screens, running coating.

Before reconstruction

The opening ceremony of the World Cup, semi-finals and the final will go through here. Considering the requirements of FIFA, the demolition and new construction of a large sports arena "Luzhniki was originally intended. Capacity in the event could increase to 90 thousand spectators, the area is up to 220 square kilometers. However, later decided not to demolish, but to reconstruct the arena.

The last football match was held here in 2013, May 10th. There were "Wings of the Soviets" and "Spartak". In 2013, the World Championship of the World Rugby Championship was held at the stadium. After that, the stadium was closed for reconstruction.

Progress of reconstruction

During the preparation for the preparation for the 2018 Championship, a substantial part of the work was taken by the elongation of the visor. For these purposes, 457 tons of metal structures were used. The result is very noticeable. The visor grew by eleven meters. The stands as a result also moved closer to the field ten meters. The capacity of "Luzhniki" before the reconstruction was 78,000 seats. Now it has increased by three thousand. The stands are scheduled to arrange in two tiers. So much will increase the overview for those who are at the top.

The number of inputs will increase almost twice: from 13 to 23. Cascade transitions inside will allow distribution of fans flows and facilitate the movement of people inside the stadium. The capacity of "Luzhniki" after the reconstruction will be 81,000 seats.

Arena was also suitable for the newest technologies. It resembles a puff pastry. Installed aeration system. With it, the surplus of moisture will be excreted, air supply to the roots of herbs will be excluded. The heating system of the field will allow playing here year-round.

The reconstruction of the pool is also planned in the complex. Closed it in October, after reconstruction, it will turn into a modern swimming center. Due to underground premises, the total area will be increased. 25- and 50 meter tracks will be saved. A children's zone will open with various slides, entertainment. After the reconstruction of the "Luzhniki" pool will take up to 10 thousand people per day.

Figures and facts

The capacity of the stadium "Luzhniki" after the reconstruction will be much higher, it will increase from 78 to 81 thousand places.

As for the cost of reconstruction, it is worth saying that the crisis played a role. The fall of the ruble forced to revise the cost of the project, they managed to reduce one billion rubles. It was originally planned that the capacity of the arena "Luzhniki" will be 89 thousand places, as a result, left 81 thousand. The latest data suggests that the cost of reconstruction is about 22 billion rubles.

Safety

As in olympic Sochi, in Luzhniki, it is planned to protect the entire zone at once, not separate objects. Ten zones of security have been created. On the first cordone will be the main inspection.

Communication

The replacement was subject to forty kilometers of various communications. In the vicinity of the complex and the Wi-Fi network is organized on the stadium itself. The creation of special applications for smartphones, which will allow you to immediately view the repetitions of the episodes played.

Four thousand workers are involved in reconstruction, which go shim. Every day there are thousands of people.

The updated complex will remain the property of OJSC Luzhniki. According to the owners, after the championship, all training fields (there are only eight) will be at the disposal sports and Youth Schools. Here will be honored by young athletes.

Big Sports Arena "Luzhniki" is the legendary and largest stadium of Russia. The Moscow Stadium "Luzhniki" has already accepted Olympiad-80 and the Finnals of the UEFA Cup and Champions League. Here saved the gate of the national team Soviet Union best goalkeeper Planets Rinat Dasayev, raised over the head of the Champions League Cup Cristiano Ronaldo. Spartak has established a European record, and Sergey Yuran scored in its composition. In the summer of 2018. achievement list Arena will be replenished with the 2018 World Cup. Here will be the ceremony and the opening match, one of the semi-finals and the final.

After reconstruction from the old stadium, only walls of light sand color remained. But the filling is now super-modern. Tribunes are located in two tiers. This improved the review for the audience sitting at the very top. So-called blind zones, which used to be used as much as 10 percent of places, no more.

The capacity of the stadium increased to 81 thousand spectators, the geometry of the tribune was also changed. Tribunes as close as possible football field. Now the audience will have an ideal overview of the field from any point of the Tribune (including the lower and top rows). 300 seats equipped for persons with limited physical abilities. For VIP-viewers, at least 1.7 thousand places are provided on the main stand, for the press - about 2 thousand places.

How to get to the stadium on matches

Stadium Luzhnikiit is located south-west of the center of Moscow, in the broad radiation of the Moscow River. Usually, under the word "Luzhniki" mean the same stadium, although he himself received the name from the region of the capital.

Metro

Nearest metro stations - "Sports"(571 m) and « Sparrow Hills» (1250 m). From the metro station "Sports" Sokolnic Line (Red Line) Visitors will reach the stadium about 10 minutes. From the metro station "Sparrow Hills" - The exit towards Luzhnetsky the embankment, the last car from the center, then turn left and go on the embankment 5-7 minutes to the stadium.

Also near the territory of the complex is station MCR "Luzhniki". By the way, it's closer than from the Sports station.

On buses

Before Stadium "Luzhniki Arena" can be reached by buses of the following routes:

Nearest land transport stops:

From Sheremetyevo Airport to "Stadium Luzhniki"

Aeroexpress to the Belorussian station. Time on the way - 35-40 min.
Next, on the subway: from Art. Metro "Belorusskaya" (annular line) to art. The metro station "Park of Culture" 3 stops, further go to red liga and drive 2 stops to the Sports station. Total time on the road - 20 min.

From Domodedovo Airport to "Stadium Luzhniki"

Aeroexpress to Paveletsky railway station. Time on the way - 45-55 min.
Next, on the subway: from Art. Metro "Paveletskaya" (ring line) to Art. The metro station "Park of Culture" 3 stops, further go to red liga and drive 2 stops to the Sports station. Total travel time - 15 min.

From Vnukovo Airport to "Stadium Luzhniki"

Aeroexpress to Kiev Station. Time on the way - 40-50 min.
Next, on the subway: from Art. Metro "Kievskaya" (ring line) to art. Metro "Park of Culture" 1 Stop, then go to red liga and drive 2 stops to the Sports station. Total time on the road - 10-15 min.

From the airport Zhukovsky to "Stadion Luzhniki"

Bus number 441E to Metro Station "Kotelniki"
Next, on the subway from Art. "Kotelniki" (purple line) to art. M. Taganskaya 9 stops, further go to the annular line and drive 4 stops to the Park Culture station, then re-make a transplant to the Red line and drive another 2 stops to the Sports station. Total time on track 50-70 min.

By car

You can enter the "Luzhniki" from the Savvinskaya and Frunzen embankments, as well as the streets of a large Pirogovskaya.

Please note that the entrance to the complex is paid and during large events may be limited.

The cost of entry into the territory is 100 rubles.


Parking on site:
From 7:00 to 23:00 - parking on site is free.

Long (night parking) from 23:00 to 7:00 - 500 rubles / night.

If you want to leave a car for the night on the territory of the Luzhniki Sport Complex you should warn about this guard at the entrance and pay an additional tariff.

Nearest shipping parking to the stadium:

Street Khamovnichesky Shaft, 24
Central JSC

Street Khamovnichesky Shaft, 28
Central JSC

Luzhnikovskaya etakada
Central JSC

Komsomolsky Avenue / TTK
Central JSC

What can not be brought to the stadium?

On the stadium is prohibited to carry:
Weapons of any type, ammunition, stitching, cutting, throwing items, gas springs. It is forbidden to bring items that can be used as weapons, including cane umbrellas and helmets.
Flameless and pyrotechnic products regardless of the type and destination, including smoke checkers, firewood, signal rockets, fireflows, explosives, poisonous, poisoning substances, radioactive materials, flammable and combustible fluids.
Bottles, cups, jugs or cans, including canned, polyester items, glass, or any fragile material, as well as packaging "Tetrapak".
Alcoholic beverages, narcotic and toxic substances and stimulants.
Propaganda materials of extremist nature.
Nazi attribute or symbolism or attributes similar to the Nazi to the degree of mixing.
Technical means able to prevent the match or its participants (laser devices, lights), sounds, radio stations, universities.

Springboard at the Sparrow Mountains (previously called Leninist Mountains) built in 1953 on the project of Gully engineer. It was the chief springboard of the Soviet Union, it was here that international competitions Among the "flying skiers".

The name has become fixed for the springboard since then. But the time did not spare this majestic structure. Now it is not suitable for large international starts and Olympic victories - only for youthful training.

International Federation ski sport (FIS) changed the requirements for the geometry of the profile of the springboard. During the reconstruction, geometric parameters, as well as engineering systems of the Bolshoi Moscow Sprouta, will be aligned with these standards.

Therefore, in 2017, Moscow Springs will be able to qualify for the title of modern springboard in the world where the All-Russian and international competitions of the highest class can be held.

Affordable sport

Vorobyev Mountains - a historic sports cluster.

For sports school olympic reserve "Vorobyev Mountains" will update all the infrastructure. For its 15-year history, the school has repeatedly released future winners and winners of the largest international and all-Russian Competition. Among them: Figurists Maria Butyrskaya, Maxim Trankov, Tatyana Volosozhar and Adelina Sotnikova; Skiers Julia Chepalov and Natalia Matveyeva; Biathletes Olga Zaitseva and Svetlana Ishmuratova, as well as outstanding freestyle, skaters, skeletonists.

Now 280 young athletes are engaged in the school, which should strive for the Olympic victories, training at high-quality sports grounds.

As part of the reconstruction of the sports complex at the sparrow mountains will appear and unique sports objects For citizens: walking routes with "steaming" steps, universal starting platform, scout school, climbing, swimming pool, several sports schools, high-speed runways on skating and Tobogan (robust sleigh), as well as the center healthy image Life, contact zoo, etc.

After reconstruction, a year-round sports center opens here. active rest. Summer citizens will be able to run, swimming, rollers and skateboards, train in the rope park, arrange Vorkuta under open sky. In winter they will be available skiing, skates, snowboarding and other types of winter sports.

The territory of the Sparrow Mountains is also planned to be landscaped: new pedestrian routes will appear here, trees and shrubs will be planted.

The largest stadium in Russia. Opened in 1956. Capital reconstruction has been carried out. Cup 2018 capacity will be 81 000 Spectator. At the time of the World Cup 2018, the stadium will not change its name. He took group matches, the opening match, one match semi-finals, and the 2018 Final Final.

Summary of the stadium:

Updated: 15.06.2018

Stadium name: Luzhniki
Location: Moscow, ul. Luzhniki, 24.
Coordinates: 55.715833, 37.553611
Status: Commissioned
Year of Construction:
1956 (built), 2016 (reconstruction)
Cost: 26.6 billion rubles
Capacity: 81 000
Design: PI "Arena", GMP, GUP MNNIP Mosproekt-4
Developer: Mosinzhproekt
Contract company: Mosinzhproekt
GosExpertiza: Yes
Heritage: Russian national football team Olympic complex "Luzhniki"
Official site: www.luzhniki.ru.
Article in Wikipedia

Before the World Cup 2018 World Cup in the arena, a large-scale reconstruction was carried out without affecting the historical external part of the construction. As a result of the competition, the company became the designer and contractor of the reconstruction of the Arena JSC "Mosinzhproekt"

At the stadium "Luzhniki" will pass the opening ceremony and match opening World Cup between Russian national teams and Saudi Arabia. Also "Luzhniki" will take one of the semifinals and the final of the tournament.

Legendary Stadium "Luzhniki". How many great matches have seen these tribunes. The last of them was the only Final of the Champions League, which was entrusted to Russia. Then, in just one match, the entire lawn was rebuilt, replacing it with natural. Now the stadium has undergone a large-scale reconstruction.

Stadium "Luzhniki" - Stadium S. big history, BUT B. last years mercilessly criticized. Once he was one of the largest in Europe and accompanied under 90 thousand fans. Since those times, he was rebuilt several times, significantly reducing its capacity in favor of safety requirements.

In the 2000s, "Spartak" and "CSKA" played in this stadium, and only on Derby between two great clubs could be seen a complete "puddle". The reason for this is comfort level in accordance with modern requirements, and treadmills between the stands and the field, who give the audience from football action. After all, "Luzhniki" were built not only for football matches. For example, the latter major Competitionconducted on "Luzhniki" before the start of reconstruction - World Championship athletics 2013.

Reconstruction of stadium Luzhniki to World Cup 2018

At once, as soon as Russia submitted its application for the 2018 World Cup, it was decided to spend the match of the opening and final on the central sports constructions Moscow. However, initially experts disagreed: demolish the construction and erect a new arena on the place of old or arrange a large-scale reconstruction.

Reconstruction meant several options for updating sports arena. Namely - three. All of them were decorated and presented with FIFA in the form of projects. In all options, the idea of \u200b\u200bincreasing the roof area of \u200b\u200bthe stadium was attended - for more comfortable views of the matches. Another problem was to increase the capacity of the arena, for this in two options for reconstruction it was proposed to lower the field for 4 and 8 meters respectively.

img

The priority for the city was to preserve the historical appearance of "Luzhniki" - the recognizable, "open" view from the sparrow mountains. This argument became the main thing when choosing in favor of reconstruction. Although it was originally estimated more expensive.

Video about the stadium:

Project reconstruction

As a result, the following decision was made.. Only walls and roof will remain from the old stadium, the entire inner part will be rebuilt. This will save the historical facade, fully updating the construction technically. In the spring of 2015, the installation of the roof was completed (structures on top of the old), its area increased, fully collapsed the tribune from precipitation and the sun. Despite the preservation of the historical appearance, it will be a high-tech media player, covered with multiple LEDs - this will allow various information to be transmitted during matches for fans.

img

Finally, "Luzhniki" will still receive the long-awaited natural field. The problems of holding matches in winter will no longer be, because the newest stadiums are equipped with field heating systems and the tribune. It will be possible to play round yearAnd the stands will finally become closer to the field, corresponding to relevant fans.

img

By the summer of 2016, the construction of the Stadium Tribune was already completed, the workers began a device for a playing field. The field is deepened, the old soil is exported, replaced by a new one - more suitable for the modern lawn. As stated in FIFA in July 2016, the pace of work is ahead of the approved schedule.

In addition to the stadium itself, the sports complex will receive many small sports facilities. This includes numerous football training fields and base for the location of the national team. Also decided to abandon construction in the territory sport complex A number of commercial objects.

img

In contrast to all other under construction and reconstructed stadiums to the 2018 World Cup, "Luzhniki" do not become After the global forum home arena For one of the Moscow teams. "Spartak" already built his stadium "Opening-Arena", and CSKA highly erects its own "house" after several years of approvals and interdepartmental disputes.

img

Progress of reconstruction

The reconstruction of the "Luzhniki" stadium to the 2018 World Cup began in 2014, although the stadium was closed from all events already in 2013. During construction work, builders dismantled 250 thousand tons of reinforced concrete structures and partitions, instead of which 1800 tons of metal farms and beams were installed. In August 2016 Natural lawn was located in the arena. Reconstruction ended June 9, 2017.

img

What has changed after reconstruction?

MAIN CHANGE - the stadium became football. Previously, the stands and the field shared wide running tracks. Because of this, the viewing matches was not comfortable according to modern standards. There are currently no treadmills, and the stands are as close as possible to the football field. In fact, in the old walls built perfectly new Arena. Stadium capacity increased from 78 to 81 thousand spectators.

Finally, the main Arena of Russia received modern natural lawn High Quality. For many years, synthetics were packed here - on the old stadium, the grass was badly barked. This significantly changes the quality of the game and the level of comfort for football players. In a multi-layer "threshold" under the lawn, a drainage is provided that can cope with any precipitation. Also under the field installed a heating system, even in winter, the soil temperature does not fall below 15 degrees of heat.

img

Under the roofing stadium for visitors, an observation deck is arranged, visiting which is open in days free from football matches at the stadium. The colors of seats in the audience stands of the arena, which is the basis of the internal design of the arena. Earlier, the seats were red, yellow and orange, now nine shades are used - from burgundy to golden.

The roof of the stadium now completely protects the stands from precipitation - for this it has extended it by 11.5 meters. The outer part of the roof is covered with a field of LEDs that turned it into a media screen area 30 thousand square meters. meters. Now, during soccer broadcasts, there will be particularly beautiful chambers over the stadium, the screen will be able to broadcast any images.

img

"Luzhniki" now comply with modern safety and comfort requirements. The width of the outputs from the tribune, the number of outputs from the stadium is increased to 16. The stands are also arranged on all modern standards: despite the greater capacity, from any place an excellent field overview.

November 11, 2017 The first match took place on the renewed arena "Luzhnikov". The Russian national team took the Argentina national team headed by Lionel Messi in a friendly game. The Russian national team lost with a score of 0: 1, and the author of the first ball on the reconstructed stage of the final of the World Cup 2018 was the Manchester City striker Sergio Aguero. The match was held with the manschlage.

Cost of the reconstruction of stadium Luzhniki to World Cup 2018

With the initial application, the cost of the reconstruction of Luzhnikov was $ 240 million (including the value of currencies for 2010). After the project's work is adopted in 19 billion rubles. Last voiced numbers - 350 million euros (for July 2015). It is not so much for the construction, which today is recognized as one of the most complex stadiums in the world.

In fact, the cost of reconstruction of the stadium was 26.6 billion rubles.

How to get to the stadium Luzhniki?

You can get to the stadium in several ways:

Metro

Eat to the Sports Station. Exit the third car, if you go from the center. Next in a straight line.
Or to the station "Vorobyev Mountains." Exit from the last car, if you drive from the center.

On MCC

Follow MCC (Moscow Central Ring) to Luzhniki Station. Exit from the last car, if you go towards the station "Kutuzovskaya". Next rotate to the right and in a straight line.

You can also easily reach the stadium by taxi or on your personal vehicle.

Scheme of the stadium in sectors with places

img